[1]
Sutartiah, F. and Nur Amalia, A. 2026. Investment cost analysis and payback period of waste heat recovery system technology in a nickel pyrometallurgical smelter with 300,000 tons NPI/ year capacity: a case study of PT “X” in the IMIP Morowali industrial area. SAINTEKS : Jurnal Sain dan Teknik. 8, 02 (Sep. 2026), 213–225. DOI:https://doi.org/10.37577/sainteks.v8i02.1133.