Sutartiah, F., & Nur Amalia, A. (2026). Investment cost analysis and payback period of waste heat recovery system technology in a nickel pyrometallurgical smelter with 300,000 tons NPI/ year capacity: a case study of PT “X” in the IMIP Morowali industrial area. SAINTEKS : Jurnal Sain Dan Teknik, 8(02), 213–225. https://doi.org/10.37577/sainteks.v8i02.1133