Sudarman, N. N. (2024) “Batch Scheduling Model For a Flow Shop Two Stage to Minimize Total Actual Flow Time”, SAINTEKS : Jurnal Sain dan Teknik, 6(2), pp. 188–202. doi: 10.37577/sainteks.v6i02.646.