1.
Sutartiah F, Nur Amalia A. Investment cost analysis and payback period of waste heat recovery system technology in a nickel pyrometallurgical smelter with 300,000 tons NPI/ year capacity: a case study of PT “X” in the IMIP Morowali industrial area. SAINTEKS [Internet]. 2026Sep.28 [cited 2026Sep.29];8(02):213-25. Available from: https://ejournal.uicm.ac.id/index.php/sainteks/article/view/1133