Proposed Improvement of Production Facility Layout at PT XYZ Using Activity Relationship Chart (ARC) Method to Minimize Material Handling Costs

Keywords: Keywords: Activity Relationship Chart (ARC), Back-Tracking, Facility Layout, Material Handling, Room Proximity.

Abstract

PT XYZ is a company engaged in the production of herbal food products. Observations indicate that the current production facility layout is not optimal, primarily due to the use of two separate buildings, which results in inefficient material flow. The presence of backtracking patterns and underutilized areas further contributes to increased material handling costs, which reach Rp5,846,182 per month. This study aims to propose an improved facility layout to minimize material transfer distance and time while reducing material handling costs, thereby enhancing production efficiency. The Activity Relationship Chart (ARC) method is employed to analyze the interrelationships between production activities based on spatial proximity. Data were collected through questionnaires distributed to production employees to identify layout requirements for greater efficiency. The ARC analysis results are visualized in the Activity Relationship Diagram (ARD) and Area Allocation Diagram (AAD), which serve as the foundation for designing the proposed layout. The evaluation of the new layout demonstrates significant improvements, including a reduction in material transfer distance by 31,999 meters per month, a decrease in transfer time by 17,480 seconds per month, and an efficiency gain in material handling costs amounting to Rp3,522,508 per month (60.25%). These findings are expected to serve as a reference for the manufacturing sector in designing more efficient production facility layouts to enhance productivity and reduce operational costs.

Downloads

Download data is not yet available.

References

Apple JM. Tata letak Pabrik dan Pemindahan Bahan. 3rd ed. Bandung: Penerbit ITB; 2019.
Asef-Vaziri A, Laporte G. Loop Based Facility Planning and Material Handling. Europian Journal of
Operational Research. 2005;164:1-11.
Bhagya TG, Yulianti D, Prakarsa G, Gitardiana AN. Re-Layout Puskesmas X Pasca Pandemi Covid
19 melalui Metode ARC, Metode Konvensional dan Simulasi Promodel. Sainteks: Jurnal Sain dan Teknik. 2023;5(1):80–91.
Heizer J, Render B. Manajemen Operasi. 11th ed. Jakarta Selatan: Salemba Empat; 2014.
Immanuel J, Santoso A, Hartono M. Analisis perancangan tata letak fasilitas di perusahaan XYZ
produksi kedelai dengan systematic layout planning. JENIUS : Jurnal Terapan Teknik Industri. 2023 Nov 30;4(2):250–61.
Juraj C, Zdenka B, Jozef G. Material Flow Optimization as a Tool for Improving Logistics Processes
in the Company. Applied Science, 2025;15(06), 3116.
Maheswari, Firdauzy. Evaluasi Tata Letak Fasilitas Produksi untuk Meningkatkan Efisiensi Kerja
pada PT. Nusa Multilaksana. Jurnal Teknik. 2015.
Muther R, Hales L. Systematic Layout Planning Fourth Edition. 4th ed. Marietta: Management &
Industrial Research Publications; 2015.
Ohno T. Toyota Production System: Beyond Large-Scale Production. New York: Productivity
Press; 1988.
Panjaitan FY, Azizah FN. Perancangan Tata Letak Fasilitas Gudang Produk Jadi menggunakan
Metode Activity Relationship Diagram Pada PT. JVC Electronics Indonesia. Jurnal Ilmiah Wahana Pendidikan. 2020;8(9):30–8.
Purnomo H. Manajemen Operaasi. Yogyakarta: CV Sigma; 2017.
Rosyidi MohR. Analisa Tata Letak Fasilitas Produksi Dengan Metode ARC, ARD, dan AAD di PT.
XYZ. Jurnal Teknik Waktu. 2018;16(1):82–95.
Sasono AF, Ismail VY, Asworo HR, Budiman A, Dhivari D. Dalam Perencanaan Tata Letak Fasilitas
Pada PT.XYZ Dengan Menggunakan Software WinQSB. Journal of Industrial and
Engineering System. 2024;5(1):42–9.
Sugiyono. Statistik untuk Penelitian . Bandung: Alfabeta; 2021.
Wignjosoebroto S. Tata Letak Pabrik dan Pemindahan Bahan. 3rd ed. Surabaya: Penerbit Guna
Widya; 2020.
Published
2025-09-28
How to Cite
Widia, I., Bhagya, T., & Anggaliya, P. (2025). Proposed Improvement of Production Facility Layout at PT XYZ Using Activity Relationship Chart (ARC) Method to Minimize Material Handling Costs. Sainteks: Jurnal Sain Dan Teknik, 7(02), 394-408. https://doi.org/https://doi.org/10.37577/sainteks.v7i02.921
Section
Articles